Fonterra – Te Rapa
D5 Powder Transport Remediation

For this project we, alongside Tetra Pak, retrofitted an unused room within Fonterra’s facility to house vacuum pumps for the dryer buildings.

Fonterra – Pahiatua
P3 Parapet Waterproofing Project

Fonterra asked for us to complete the weatherproofing works to the parapet of their P3 dryer. The work involved us partnering with DLA, Equus and Turfrey to remove the existing flashings and line the parapet with an Equus TPO membrane and colorsteel flashings.

Westland Milk Products Hokitika
Pipe Bridge Foundations

To assist the Lactoferrin project, our team worked with Brightwater Engineering and Westland Milk Products to construct concrete foundations for the new pipe bridges to service their facility.

Fonterra Te Rapa
D4 Airlock

For the FY24 winter shut, we constructed a temporary insulated panel airlock to allow movement of plant and equipment associated with the winter shut works in the D4 dryer building.